Artemis I Launch - Engineering Views - Pad 39B Perimeter
Ver en NASA ↗🚀 Biblioteca espacial oficial
Imágenes y vídeos de NASA
Explora el catálogo multimedia público de NASA sin salir de TuPortalNews.
Explora temas destacados
Selecciona un tema o realiza una búsqueda personalizada.
From left to right, Courtney Beasley, NASA communications; NASA Associate Administrator Amit Kshatriya; Charlie Blackwell-Thompson, Artemis II launch director; John Honeycutt, chair, Artemis II mission management team; and Emily Nelson, NASA’s chief flight di…
Ver en NASA ↗Artemis I Launch - Engineering Views - Tracking
Ver en NASA ↗Teams at NASA’s Michoud Assembly Facility in New Orleans move the forward skirt, which will be used on the SLS (Space Launch System) rocket’s core stage for the agency’s Artemis IV mission, into the vertical assembly center on Dec. 2. Inside the tooling, the …
Ver en NASA ↗NASA’s Space Launch System and Orion spacecraft launched from the center’s launch pad 39B for the Artemis I mission on November 16. This will be an uncrewed flight test that will demonstrate the ability of the SLS rocket to safely carry the Orion spacecraft a…
Ver en NASA ↗Artemis I Launch - Engineering Views - ML Deck
Ver en NASA ↗NASA’s Space Launch System and Orion spacecraft launched from the center’s launch pad 39B for the Artemis I mission on November 16. This will be an uncrewed flight test that will demonstrate the ability of the SLS rocket to safely carry the Orion spacecraft a…
Ver en NASA ↗Artemis I management team provides a pre-launch briefing following the Mission Management Team meeting ahead of the Artemis I launch. NASA’s Space Launch System and Orion spacecraft will launch from the center’s launch pad 39B on a flight test around the Moon…
Ver en NASA ↗NASA celebrated the 50th anniversary of the Apollo 11 mission by hosting multiple events at Kennedy Space Center.
Ver en NASA ↗NASA’s crawler-transporter 2 carrying the agency’s Artemis II SLS (Space Launch System) rocket and Orion spacecraft, secured to the mobile launcher, rolls out from High Bay 3 inside the Vehicle Assembly Building to Launch Complex 39B at NASA’s Kennedy Space C…
Ver en NASA ↗NASA provides a news conference to discuss the scrub of the September 3 Artemis I launch attempt of the Space Launch System rocket and Orion spacecraft. The uncrewed mission will demonstrate the ability of the SLS rocket to safely carry the Orion spacecraft a…
Ver en NASA ↗Teams at NASA’s Michoud Assembly Facility in New Orleans lift a forward ring into the vertical assembly center on Nov. 19. There, the ring will be attached to the forward skirt, which will be used on NASA’s SLS (Space Launch System) rocket core stage for the …
Ver en NASA ↗These videos and images show the silver, 130-foot-tall liquid hydrogen tank lifting out of the blue, 170-foot-tall vertical assembly center. Employees use cranes to lift the tank from the center and place it on cradles sitting on mobile transport platforms to…
Ver en NASA ↗From left to right, Rachel Kraft, NASA communications; Lori Glaze, acting associate administrator, Exploration Systems Development Mission Directorate; Shawn Quinn, program manager, Exploration Ground Systems; Chris Cianciola, deputy manager, NASA’s SLS (Spac…
Ver en NASA ↗Innovation Showcase for NASA's Kennedy Space Center Innovation Days
Ver en NASA ↗This video shows the 130-foot-tall liquid hydrogen tank clad in its pale, cream-colored thermal protection system. Sitting on blue cradle-like stands atop self-propelled mobile transporters, the tank is moved across the tarmac from a detached production area …
Ver en NASA ↗Seen here is the Orion capsule first look back at Earth for the Artemis I mission. The Space Launch System rocket and the Orion spacecraft launched at 1:47am EST from Kennedy Space Center launch pad 39B. This will be an uncrewed flight test that will demonstr…
Ver en NASA ↗Artemis II Core Stage Arrival (07/23/2024) and Offload/Transport to Vehicle Assembly Building (07/24/2024).
Ver en NASA ↗NASA Agency leadership along with Industry officials and International partners meet to during the Artemis I Flight Readiness Review (FRR) takes place on Monday, August 22 at Kennedy Space Center. The FRR will focus on the preparedness of the Artemis I Space …
Ver en NASA ↗The massive 212-foot long Space Launch System (SLS) core stage was offloaded from the Pegasus Barge on April 29, 2021, after arriving at NASA’s Kennedy Space Center in Florida. Teams with Exploration Ground Systems (EGS) and lead contractor Jacobs transferred…
Ver en NASA ↗NASA’s crawler-transporter 2 carrying the agency’s Artemis II SLS (Space Launch System) rocket and Orion spacecraft, secured to the mobile launcher, rolls out from High Bay 3 inside the Vehicle Assembly Building to Launch Complex 39B at NASA’s Kennedy Space C…
Ver en NASA ↗Artemis industry partners conduct a briefing to discuss the role of industry on advancing human exploration. NASA’s Space Launch System and Orion spacecraft will launch from the center’s launch pad 39B on a flight test around the Moon on August 29. The uncrew…
Ver en NASA ↗Contenido y metadatos proporcionados por la NASA Image and Video Library.